Hon La InternationalMulti‑purpose Port
Two green cranes loading cargo onto a vessel at the Hon La berth
International multi-purpose port

Hon La International Multi‑purpose Port

The deep-water sea gateway of the North Central region.

Explore the project
Cargo vessel alongside the berth in Hon La Bay
Hon La Economic Zone

A sheltered bay

About 9 km², protected by Hon La and Hon Co islands, with natural depths suitable for large vessels.

Being located in a sheltered bay is a major advantage for year-round operations.

About the company
Two shore cranes working beside a vessel, with Hon La Island in the distance
Two phases, six berths

6 million tonnes per year

Able to receive bulk carriers up to 70,000 DWT once phase 2 is completed.

Port services
About the company

Investor and operator of Hon La Port

Hon La Port Joint Stock Company invests in, builds and operates Hon La International Multi-purpose Port, serving the transport of goods and raw materials for production and import-export in Hon La Economic Zone and the province’s industrial parks, and also handling transit cargo for Laos and northeastern Thailand.

Hon La Bay covers about 9 km² and is sheltered by Hon La Island, Hon Co Island and the breakwaters linking the islands. About 2.5 km from shore the depth already reaches −15.5 m (Chart Datum), suitable for large vessels. Berth No. 1 began operating in April 2026 and received its first cargo vessel from Germany; berths No. 1 and No. 2 are now both in operation.

Read the full introduction

Aerial view of Hon La International Multi-purpose Port and Hon La Bay
Aerial view of Hon La International Multi-purpose Port and Hon La Bay
  • 2,300VND billionTotal project investment
  • 6berths4 berths in phase 1, 2 berths in phase 2; 1,180 m of berth line including the mooring revetment
  • 70,000DWTMaximum bulk and project cargo vessel size (100,000 DWT when lightened, per the detailed master plan)
  • 6million tonnes/yearPlanned capacity once both phases are completed
Services

Port services

The port serves cargo owners in Hon La Economic Zone and cargo flows passing along the Route 12A corridor.

General cargo handling

Receives general cargo vessels, containers and liquid cargo (excluding petroleum and LPG) up to 50,000 DWT, handled by a 45-tonne Liebherr multi-purpose crane. Serves machinery, supplies and import-export cargo.

Bulk and project cargo handling

Receives bulk and project cargo vessels up to 70,000 DWT: coal, ore, wood chips, construction materials, agricultural products, equipment and structures. Wood chips are loaded onto vessels by conveyor at about 700 tonnes per hour.

Yard and warehouse storage

Yards and warehouses for bulk, container and general cargo behind the berths. Phase 1 has about 105,000 m² of yard and about 10,000 m² of warehouse; phase 2 adds about 58,000 m². Includes a coal and ore blending area in an enclosed warehouse.

Transport connections

Coordinates road transport from the port to industrial parks and along National Highway 12A to the Cha Lo international border gate.

View all servicesView tariff

Operating schedule announced: berth No. 1 from April 2026, berth No. 2 from August 2026

The port is operating berth No. 1 on a temporary basis from April 2026 and berth No. 2 from August 2026, with the whole investment and construction process expected to finish in Q1 2027. Bringing the port into early operation to handle import-export cargo for local businesses brings greater advantages to Quang Tri’s economy.

Hon La Port self-funds a shared channel for vessels up to 70,000 DWT (lightened)

Groundbreaking of Hon La International Multi-purpose Port